- Reduced the maximum restarts for PM2 processes from 20 to 8 and added a restart delay of 2000ms for better stability.
- Improved error handling during server startup and PM2 connection, ensuring clearer logging and graceful exits on failure.
- Introduced a utility function to filter out PM2 metadata from environment variables, preventing conflicts during process management.
Vite listens on 8500 and proxies /ops to the control plane. Admin Ops UI
covers pause/resume, scale, drain/force restart, and restart-needed banner.
Co-authored-by: Nasyarobby Putra <nasyarobby@gmail.com>